Use
Roller, brush or faux finishing tools. Coat in sections of 1m². Leave a wet edge into which the next section can be blended. For more vivid results, apply more coats. The final result will be visible after 24 hours. For better results, apply DECO ROYAL always in the same direction. Thin by 5-15% WATER.
Drying out - coverage
Drying times are dependent on ambient temperature and film thickness.
Touch dry: 1-2 hours.
Recoat: 4-6 hours.
Practical coverage: 8-12m²/L depending on the thickness of each coat and the surface porosity.